August 2, 2018

Thanks to Landsec and Interserve for up to date photos, the approximate position of paths and canal have been added. There is a concrete canal channel to be built in the covered area, main photo, that runs underneath the goods delivery yard. Most of the sheet metal piling should be installed. Unfortunately, there will be a lot of soil left on the canal route (estimated at 6000 cubic metres) which we will have to remove

 

Image may contain: outdoor

 

No automatic alt text available.

 

Image may contain: outdoor

Image may contain: one or more people, people playing sports and outdoor

#

Comments are closed