August 2, 2018
Thanks to Landsec and Interserve for up to date photos, the approximate position of paths and canal have been added. There is a concrete canal channel to be built in the covered area, main photo, that runs underneath the goods delivery yard. Most of the sheet metal piling should be installed. Unfortunately, there will be a lot of soil left on the canal route (estimated at 6000 cubic metres) which we will have to remove
Comments are closed